Project Gallery
Orris 3C Greenopolis enjoys a prime location in Sector 89, which is strategically positioned near the upcoming Dwarka Expressway. This proximity ensures seamless connectivity to key destinations in Gurugram and Delhi. The expressway, once fully operational, will drastically reduce travel time to IGI Airport, Delhi, and other central business districts. The project is also well-connected to the Gurgaon-Sohna Highway and the NH-8, providing easy access to Cyber City, Golf Course Extension Road, and other commercial hubs. For daily commuters, the presence of the Rapid Metro and proposed metro lines further enhances connectivity. Families with children will appreciate the proximity to reputed educational institutions such as DPS International, GD Goenka World School, and Shiv Nadar School, all within a short drive. Healthcare needs are catered to by multi-speciality hospitals like Artemis Hospital, Medanta - The Medicity, and Fortis Memorial Research Institute, which are easily accessible. Additionally, the area is dotted with retail hubs, entertainment zones, and dining options, ensuring that residents have everything they need within reach. The upcoming Gurgaon Metro extension and the proposed Rapid Rail will further boost the area's connectivity, making it a smart choice for homebuyers. This location is a key highlight for those looking at new projects in Gurgaon that offer both convenience and growth potential.
Orris 3C Greenopolis is spread across a sprawling 14.5 acres, with a well-planned masterplan that prioritizes open spaces and community living. The project comprises 10 towers that rise to a height of G+14 floors, offering a mix of 2BHK, 3BHK, and 4BHK residences. The layout is designed to maximize green cover, with over 60% of the area dedicated to landscaping, including a central green plaza and tree-lined avenues. The apartments are thoughtfully configured, with sizes ranging from 1,340 sq. ft. to 2,680 sq. ft., ensuring ample space for every family. The clubhouse, spanning 40,000 sq. ft., is a hub of recreational activities, featuring a fully equipped gymnasium, indoor games room, and a multipurpose hall. Residents can enjoy a temperature-controlled swimming pool, a dedicated kids' play area, and a jogging track that winds through the landscaped gardens. For sports enthusiasts, there are courts for tennis, basketball, and badminton. The project ensures a secure living environment with 24/7 security, including CCTV surveillance, intercom facilities, and trained security personnel. Additionally, the development is equipped with 100% power backup for common areas and lifts, ensuring uninterrupted comfort. Ample parking space is provided, with dedicated parking for each unit. The use of eco-friendly materials and rainwater harvesting systems underscores the project's commitment to sustainability. These features make it one of the most sought-after Orris 3C Greenopolis residences in the area.
As of February 2017, the construction of Orris 3C Greenopolis was in its advanced stages, with possession slated for December 2017. The developer, 3C Developer, has a proven track record of delivering projects on time, with a portfolio that includes successful developments like 3C Commerzone and 3C Palm Meadows. The company is known for its transparent dealings and adherence to quality standards. The project has received all necessary approvals from the relevant authorities, and the construction quality is being closely monitored to meet the highest benchmarks. Buyers can have confidence in the project's timely completion, given the developer's history. The current status indicates that the project is nearing completion, with finishing touches being applied to the interiors and landscaping. This is a positive sign for investors and end-users alike, as the project is expected to be ready for occupancy soon. The developer's commitment to delivering a world-class living experience is evident in the meticulous attention to detail. For those considering this project, it is advisable to visit the site to assess the progress firsthand. The possession timeline is a crucial factor, and the developer's track record suggests that they will adhere to the promised schedule.
Orris 3C Greenopolis presents a compelling investment opportunity in Gurgaon's real estate market. The project's strategic location near Dwarka Expressway, coupled with the developer's reputation, makes it a reliable choice. The availability of 2BHK, 3BHK, and 4BHK configurations caters to a wide range of buyers, from first-time homeowners to those seeking larger family homes. The project's proximity to key IT hubs and social infrastructure ensures good rental demand and potential for capital appreciation. However, potential buyers should conduct thorough due diligence, including verifying the project's approvals and checking the developer's past deliveries. It is also advisable to compare prices with similar projects in the vicinity. Given the project's strong fundamentals, it is likely to yield good returns in the long run. The verdict is positive, with the project being a solid choice for both end-users and investors. For more detailed information, interested parties can visit the project's official page on Orris 3C Greenopolis or consult with local real estate experts.
Indicative pricing & payment options for Orris 3C Greenopolis. Request the latest cost sheet for applicable taxes and charges.
| Unit Type | Type | Super Area | Indicative Price | Floor Plan | Enquiry |
|---|---|---|---|---|---|
| 2BHK | Study Room | 1297 Sq.Ft | ₹83.99 Lacs* (₹6,476/sq.ft) | On Request | Enquire |
| 2BHK | Study Room | 1660 Sq.Ft | ₹1.08 Cr* (₹6,506/sq.ft) | On Request | Enquire |
| 3BHK | Study Room | 1910 Sq.Ft | ₹1.24 Cr* (₹6,492/sq.ft) | On Request | Enquire |
| 3BHK | Study Room | 1957 Sq.Ft | ₹1.27 Cr* (₹6,489/sq.ft) | On Request | Enquire |
| 3BHK | Study Room | 2036 Sq.Ft | ₹1.32 Cr* (₹6,483/sq.ft) | On Request | Enquire |
| 3BHK | Study Room | 2070 Sq.Ft | ₹1.35 Cr* (₹6,521/sq.ft) | On Request | Enquire |
| 4BHK | Study Room | 2750 Sq.Ft | ₹1.35 Cr* (₹4,909/sq.ft) | On Request | Enquire |
|
PRICE |
|
| B.S.P | Rs. 6250/sq.ft. |
| EDC/IDC | Rs. 330/- per sq.ft. |
| Club Membership | Rs. 150000/- |
| IFMS | Rs. 50/- per sq.ft. |
| Exclusive Parking Space Charges | Rs. 300000/- |
| Preferential Location Charges (P.L.C) | |
| Ground Floor | Rs. 200/- per sq ft |
| 1st, 2nd& 3rd Floor | Rs. 150/- per sq ft |
| 4th, 5th, 6th& 7th Floor | Rs. 100/- per sq ft |
| Landscape Facing | Rs. 100/- per sq ft |
Payment milestones & booking procedure for Orris 3C Greenopolis
(Towers 1,2,3,4,7,8,9,12,14,15,16,17,18,20,21,22,23,29)
Down Payment (Rebate 10% on BSP)
|
On application for booking |
10% of BSP |
|
Within 45 days from Allotment |
85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC + IDC |
|
At the time of Notice for possession |
5% of BSP + IFMS + Other Charges |
Construction Linked Plan
|
On application for Booking |
10% of BSP |
|
Within 30 days from Allotment |
10% of BSP |
|
Within 65 days from Allotment |
10% of BSP |
|
On Completion of Ground Floor roof slab |
10% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 3rd floor roof slab |
7.5% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 5th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 8th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 10th floor roof slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On casting of Top Floor Roof Slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On completion of Masonry work |
7.5% of BSP + Club membership |
|
On completion of Internal & External Plaster |
5% of BSP |
|
On completion of Wiring |
5% of BSP |
|
At the time of notice for possession |
5% of BSP + 100% IFMS + Other Charges |
Towers- (5,12A,27,28)
Down Payment (Rebate 10% on BSP)
|
On application for booking |
10% of BSP |
|
Within 45 days from Allotment |
85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC + IDC |
|
At the time of Notice for possession |
5% of BSP + IFMS + Other Charges |
Construction Linked Plan
|
On application for Booking |
10% of BSP |
|
Within 30 days from Allotment |
10% of BSP |
|
Within 65 days from Allotment |
10% of BSP |
|
On Completion of Ground Floor roof slab |
10% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 5th floor roof slab |
7.5% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 10th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 15th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 20th floor roof slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On casting of Top Floor Roof Slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On completion of Masonry work |
7.5% of BSP + Club membership |
|
On completion of Internal & External Plaster |
5% of BSP |
|
On completion of Wiring |
5% of BSP |
|
At the time of notice for possession |
5% of BSP + 100% IFMS + Other Charges |
Tower- (19)
Down Payment (Rebate 10% on BSP)
|
On application for booking |
10% of BSP |
|
Within 45 days from Allotment |
85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC + IDC |
|
At the time of Notice for possession |
5% of BSP + IFMS + Other Charges |
Construction Linked Plan
|
On application for Booking |
10% of BSP |
|
Within 30 days from Allotment |
10% of BSP |
|
Within 65 days from Allotment |
10% of BSP |
|
On Completion of Ground Floor roof slab |
10% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 3rd floor roof slab |
7.5% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 6th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 10th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 14th floor roof slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On casting of Top Floor Roof Slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On completion of Masonry work |
7.5% of BSP + Club membership |
|
On completion of Internal & External Plaster |
5% of BSP |
|
On completion of Wiring |
5% of BSP |
|
At the time of notice for possession |
5% of BSP + 100% IFMS + Other Charges |
Towers- (10,11)
Down Payment (Rebate 10% on BSP)
|
On application for booking |
10% of BSP |
|
Within 45 days from Allotment |
85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC + IDC |
|
At the time of Notice for possession |
5% of BSP + IFMS + Other Charges |
Construction Linked Plan
|
On application for Booking |
10% of BSP |
|
Within 30 days from Allotment |
10% of BSP |
|
Within 65 days from Allotment |
10% of BSP |
|
On Completion of Ground Floor roof slab |
10% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 3rd floor roof slab |
7.5% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 5th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 7th floor roof slab |
7.5% of BSP + 50% PLC |
|
On Completion of 9th floor roof slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On casting of Top Floor Roof Slab |
7.5% of BSP + 50% (IDC + EDC) |
|
On completion of Masonry work |
7.5% of BSP + Club membership |
|
On completion of Internal & External Plaster |
5% of BSP |
|
On completion of Wiring |
5% of BSP |
|
At the time of notice for possession |
5% of BSP + 100% IFMS + Other Charges |
Towers- (24,26)
Down Payment (Rebate 10% on BSP)
|
On application for booking |
10% of BSP |
|
Within 45 days from Allotment |
85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC + IDC |
|
At the time of Notice for possession |
5% of BSP + IFMS + Other Charges |
Construction Linked Plan
|
On application for Booking |
10% of BSP |
|
Within 30 days from Allotment |
10% of BSP |
|
Within 65 days from Allotment |
10% of BSP |
|
On Completion of Ground Floor roof slab |
10% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 2nd floor roof slab |
10% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 4th floor roof slab |
10% of BSP + 50% PLC |
|
On Completion of Top floor roof slab |
10% of BSP + 50% PLC |
|
On Completion of Masonry Work |
10% of BSP + Club Membership |
|
On Completion of Internal & External Plaster |
10% of BSP + 50% (IDC + EDC) |
|
On completion of Wiring |
10% of BSP + 50% (IDC + EDC) |
|
At the time of Notice for Possession |
5% of BSP+100% IFMS+Other Charges |
|
On completion of Wiring |
5% of BSP |
|
At the time of notice for possession |
5% of BSP + 100% IFMS + Other Charges |
Towers- 25
Down Payment (Rebate 10% on BSP)
|
On application for booking |
10% of BSP |
|
Within 45 days from Allotment |
85% of BSP + Exclusive Parking Space Charges + PLC + Club Membership + EDC + IDC |
|
At the time of Notice for possession |
5% of BSP + IFMS + Other Charges |
Construction Linked Plan
|
On application for Booking |
10% of BSP |
|
Within 30 days from Allotment |
10% of BSP |
|
Within 65 days from Allotment |
10% of BSP |
|
On Completion of Ground Floor roof slab |
12.5% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of 2nd floor roof slab |
12.5% of BSP + 50% Exclusive Parking Space Charges |
|
On Completion of Top floor roof slab |
10% of BSP + 100% PLC |
|
On Completion of Masonry Work |
10% of BSP + Club Membership |
|
On Completion of Internal & External Plaster |
10% of BSP + 50% (IDC + EDC) |
|
On Completion of Wiring |
10% of BSP + 50% (IDC + EDC) |
|
At the time of Notice for Possession |
5% of BSP+100% IFMS+Other Charges |
|
On Completion of Internal & External Plaster |
5% of BSP |
| On Completion of Wiring | 5% of BSP |
|
At the time of notice for possession |
5% of BSP + 100% IFMS + Other Charges |
* Prices and payment plans are indicative and subject to change without prior notice. Taxes (GST), stamp duty, registration, and other statutory charges are extra as applicable. Please confirm the latest cost sheet with our property advisor.
Unit layouts available in Orris 3C Greenopolis. Tap any plan to enlarge.
Orris 3C Greenopolis
Orris 3C Greenopolis
Orris 3C Greenopolis
Orris 3C Greenopolis
Orris 3C Greenopolis
Orris 3C Greenopolis
Orris 3C Greenopolis
Facilities and conveniences planned for residents of Orris 3C Greenopolis.
Quality of finishes, fittings and architectural workmanship.
Comprehensive fittings, fixtures, and construction standards for Orris 3C Greenopolis.
Move the sliders to estimate your monthly outgo. Home loans available up to 90% of unit cost.
Default loan amount is 90% of the starting price of Orris 3C Greenopolis. Indicative only — actual eligibility depends on income, credit profile and lender policy.
Possession Status: February 2017
Want current site photos, structural audit, or project delivery milestone status?
Request Site Photos & ReportApproved by premier financial institutions with attractive interest rates and flexible tenures.
ICICI
SBI
HDFC
Axis Bank
IIFL Home Loan
Indiabulls Home Loans
LIC HFL
YES Bank
Punjab National Bank
Special festive ROI, zero processing fee schemes & doorstep loan processing available.
Apply for Loan Assistance
Share your details and our advisor will send verified inventory, current rates and arrange a free site visit at your convenience.
Direct priority assistance, verified builder pricing, and private site visit desk for Orris 3C Greenopolis.
Contact us,
Everything you need to know about Orris 3C Greenopolis.
Get price sheet, availability & site visit